Case study overview
SDM at Rio Tinto Gove Australia
SDM compared against the nuclear standard for alumina extraction
Read more >
SDM ECO at tailings thickener in Mexico
Challenge to regulate the slurry density in the underflow of a tailings thickener.
Read more >
SDM at Muja Power Station
Replacing radioactive density meters to manage the concentration of fly ash.
Read more >
Gold extraction mining plant
Measurements are reliable, stable and environmentally friendly.
Read more >
Case study Copper foil
Monitor the Cu++ and H2SO4 concentrations in real-time
Read more >
SDM in Tunneling Industry
The customer had to drill a new 200-meter sewer for their project.
Read more >
SDM at Vinacomin Cua Ong Site
SDM 30-day trial with two different sampling methods in Vietnam.
Read more >
Cannington Paste Plant
South32 needs to control the density of the slurry going to the storage tank.
Read more >
Ferrochrome Smelter
Challenge to remove manual sampling from the thickener underflow.
Read more >
SDMs at Agnico Eagle
SDMs for control purposes in the grinding and separation processes.
Read more >